Free Heijunka Box Tool

Spread every product evenly across the day: build a heijunka box, check the workload of each interval and get a repeating mixed-model sequence.

  • 100% free
  • No sign-up
  • Export to PDF, PNG & Excel
  • Data stays in your browser
Total demand450/day
Takt time120 s
Intervals15 × 60 min
Utilization84%
Overloaded intervals0

Click a product to edit it. Kanbans are spread evenly over the day, so every product is made in every part of the day instead of in one big batch.

HEIJUNKA BOX15 intervals of 60 min · takt 120 s · kanbans per interval06:0007:0008:0009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:00V-10240/day · 24 kanbans × 10V-20120/day · 12 kanbans × 10V-3060/day · 12 kanbans × 5V-4030/day · 6 kanbans × 5Add a productAdd productLoad per interval84% of the day on average72%67%94%94%94%72%67%94%94%94%72%67%94%94%94%100%Mixed-model sequence (repeat through the day): 15 units per patternV-10V-20V-10V-30V-10V-20V-10V-40V-10V-20V-10V-30V-10V-20V-10
Heijunka box with one row per product and one column per pitch interval, the load of each interval and the mixed-model sequence. Select a product to edit it.

Products

ProductDemand / dayUnits / kanbanCycle time (s)KanbansWork (min)
24320
12220
12140
680

What is heijunka?

Heijunka, or production levelling, is one of the foundations of the Toyota Production System. Customer orders arrive unevenly, but if production follows them directly, every peak ripples upstream as overtime, inventory and expediting. Heijunka levels both the volume (the same quantity every day) and the mix (every product made in every part of the day), so the whole value stream runs at a steady rhythm set by takt time.

How a heijunka box works

  1. The box has one row per product and one column per pitch interval (e.g. every 60 minutes).
  2. Each kanban represents one container of a product, and is placed in the slot of the interval when it should be made.
  3. At each interval, a material handler takes the cards from the next column to the pacemaker process and collects the finished containers.
  4. If the previous cards are not finished, the problem is visible within one interval, not at the end of the shift.

Heijunka example

A valve line has 900 minutes a day and four products with daily demand of 240, 120, 60 and 30 units: 450 units, a takt time of 120 seconds. Instead of running each product in one batch, the heijunka box places one or two V-10 kanbans (10 units each) in every one-hour column, V-20 and V-30 kanbans in most columns and a V-40 kanban every two to three hours. The load row checks that slow products do not pile up in the same hour, and the mixed-model sequence V-10, V-20, V-10, V-30… repeats through the day.

Prerequisites for levelling

  • Quick changeovers: levelling multiplies changeovers; reduce them with SMED.
  • Stable processes: high OEE and standard work.
  • A finished-goods buffer to serve uneven orders while production stays level.
  • One pacemaker process that receives the schedule; upstream processes are pulled by kanban.

How to use this Heijunka tool

  1. Set the time frame. Enter the available production time per day, the pitch interval (column width) and the start time.
  2. Add the products. For each product, enter its daily demand, units per kanban and cycle time.
  3. Read the box. The tool spreads each product's kanbans evenly over the intervals of the day.
  4. Check the load. The load row shows the work in each interval against its length; red intervals are overloaded.
  5. Use the sequence. The mixed-model sequence gives the repeating order of units to build at the pacemaker.
  6. Export. Export the heijunka box to PDF, PNG or Excel and use it to load the physical box.

Frequently asked questions

What is heijunka?

Heijunka (Japanese for "levelling") is a lean technique that levels the type and quantity of production over a fixed period. Instead of making all of product A, then all of B, a levelled line makes a little of every product in every part of the day, in a repeating mix, so that upstream processes and suppliers see a steady demand.

What is a heijunka box?

A heijunka box is a scheduling board with a row for each product and a column for each pitch interval of the day. Kanban cards placed in the slots tell the pacemaker process what to make in each interval. A material handler takes the cards out one column at a time, which also checks every interval that the line is keeping pace.

What is pitch?

Pitch is the amount of time needed to make one container (one kanban) of product: takt time × pack-out quantity. In a heijunka box, the pitch interval is the column width: the time between two withdrawals of kanbans from the box, often 15 to 60 minutes.

What is a mixed-model sequence?

A mixed-model sequence is the repeating order in which products are made, proportional to demand. With daily demand of 240 A, 120 B, 60 C and 30 D, the smallest repeating pattern has 15 units: 8 A, 4 B, 2 C and 1 D, spread as evenly as possible.

What are the benefits of production levelling?

Lower finished-goods inventory, shorter lead times, a steady workload for people and equipment, stable kanban loops and demand for suppliers, and fewer peaks of overtime. Levelling is a prerequisite for a stable pull system.

What do I need before I can level production?

Short changeovers (see SMED), because levelling means many more changeovers; a stable process with enough capacity; and finished-goods stock or a supermarket to absorb short-term demand variation while production runs to the levelled plan.

Free tool

5S Audit

Score Sort, Set in order, Shine, Standardize and Sustain, see the 5S radar and track the findings.

Open tool →
Free tool

Kaizen Report

Document quick improvements on before/after kaizen cards and total the annual savings.

Open tool →
Free tool

Kaizen Event

Plan a kaizen blitz: charter, team, daily agenda, before/after metrics and the 30-day action list.

Open tool →
Free tool

Standard Work

Build a standard work combination sheet with manual, machine and walk time against takt.

Open tool →
Free tool

Takt Time Calculator

Calculate takt time from available time and demand, then compare every step and size the crew.

Open tool →
Free tool

Cycle Time Analysis

Run a time study: element statistics, sample size check, rating and allowances to standard time.

Open tool →
Free tool

Line Balancing

Balance tasks across stations with precedence, see the Yamazumi chart and balance efficiency.

Open tool →
Free tool

Kanban Calculator

Size kanban loops from demand, lead time and safety stock, then print the kanban cards.

Open tool →
Free tool

Poka-Yoke

Mistake-proof a process: rate each error, design a device and move it up the control hierarchy.

Open tool →
Free tool

SMED

Cut changeover time: split internal and external work, convert and streamline, compare before/after.

Open tool →
Free tool

Visual Management Board

Run a daily SQDCP tier board with letter calendars, KPI status and an action list.

Open tool →
Free tool

Gemba Walk

Walk the floor with a structured checklist, log observations and follow up on the actions.

Open tool →
Free tool

Waste Analysis

Find and cost the 8 wastes (TIMWOODS) and rank where the time and money go.

Open tool →
Free tool

OEE Calculator

Calculate availability, performance, quality and OEE with a six big losses waterfall.

Open tool →
Free tool

Value Stream Mapping

Map material and information flow, calculate takt time, lead time and process cycle efficiency.

Open tool →
Free tool

Spaghetti Diagram

Trace people and material movement on a floor plan and measure the distance travelled.

Open tool →

Make lean improvements stick

Cloudtheapp keeps the new standard in place: digital work instructions and checklists at the station, controlled documents with training records, audits, and every improvement action tracked to closure in one validated cloud platform.