Free 8 Wastes Analysis Tool

Walk the process with the 8 wastes in mind, record what you see, put hours and money on every waste and find out where to start.

  • 100% free
  • No sign-up
  • Export to PDF, PNG & Excel
  • Data stays in your browser
Wastes observed8 of 8
Hours lost / year1,884
Cost / year$83,288
Equivalent people1.0 FTE

Defects is the most expensive waste here ($23,280 a year, 28% of the total). Start there, and remember that waiting and inventory often hide the real problem upstream.

Yearly cost of waste: $83,288Time valued at $32/h over 240 working days, plus other costs$0$5,000$10,000$15,000$20,000$25,000DDefects$23,280 · 540 hTTransport$15,360 · 480 hWWaiting$15,360 · 480 hOOverproduction$9,000 · 0 hIInventory$8,000 · 0 hOOverprocessing$7,680 · 240 hMMotion$4,608 · 144 hSSkillsNot costed
Bar chart of the yearly cost of each of the eight wastes, largest first.

Waste observations

WasteWhereWhat you sawTimes / dayMin eachPeopleOther $/yrCost / yrImprovement idea
$4,608
144 h
$15,360
480 h
$15,360
480 h
$8,000
0 h
$23,280
540 h
$7,680
240 h
$9,000
0 h
$0
0 h

Hours per year = times per day × minutes each × people × working days ÷ 60. Cost = hours × labour rate + other yearly costs.

What is waste in lean?

In lean thinking, waste (muda) is any activity that consumes time, money or effort without adding value for the customer. Most processes are far more waste than value: in a typical value stream, less than 5% of the lead time adds value. Learning to see waste is the first lean skill; the 8 wastes give you categories to look for, and costing them helps decide what to fix first.

The 8 wastes (TIMWOODS)

WasteWhat it looks likeTypical countermeasure
TransportMoving material or information between placesFlow layout, point-of-use storage
InventoryStock and WIP above what is needed nowKanban, smaller batches, levelling
MotionWalking, reaching, searching, bending5S, ergonomics, spaghetti diagram
WaitingPeople or machines idleLine balancing, SMED
OverproductionMaking more or earlier than neededPull, takt time
OverprocessingExtra steps, checks or quality nobody asked forValue analysis, standard work
DefectsScrap, rework, errors, complaintsPoka-yoke, root cause analysis
SkillsIdeas and talent not usedKaizen, involvement, training

Waste analysis example

A waste walk in an order fulfilment area records eight observations, one per waste. Re-picking mis-picks (9 a day, 15 minutes each) and double-handling pallets (30 moves a day, 4 minutes each) each cost about 500 hours a year. Packers wait for order waves, walk to the office for labels and re-check cartons that the scale has already checked. Gift sets built before orders end up re-worked, and 14 pallets clog the dock. Costed at $32 an hour plus direct costs, the area loses about $83,000 a year, with defects the most expensive waste. Unused skills cost nothing on the chart, but the packers' ideas solve several of the others.

From waste to improvement

  1. Pick the most costly waste, or the one that causes others (often overproduction or waiting).
  2. Find its root cause with 5 Whys; waste is usually a symptom.
  3. Run a quick kaizen or, for bigger problems, a kaizen event.
  4. Measure again on the next waste walk and share the savings.

How to use this Waste Analysis tool

  1. Describe the area. Enter the area or process, the labour rate and the number of working days per year.
  2. Walk the process. For each waste you see, add an observation and choose its type from the 8 wastes.
  3. Quantify it. Enter how many times a day it happens, minutes lost each time and people involved, plus any other yearly cost.
  4. Read the chart. The chart ranks the 8 wastes by yearly cost, so you know where to start.
  5. Record ideas. Note an improvement idea for each waste, ideally from the people who do the work.
  6. Export. Export the waste analysis to PDF or Excel for the improvement plan.

Frequently asked questions

What are the 8 wastes of lean?

Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects and Skills (unused talent), often remembered as TIMWOODS or DOWNTIME. The first seven come from the Toyota Production System (Taiichi Ohno); the eighth, unused skills, was added later.

What does TIMWOODS stand for?

T: Transport, I: Inventory, M: Motion, W: Waiting, O: Overproduction, O: Overprocessing, D: Defects, S: Skills. DOWNTIME is the same list in another order: Defects, Overproduction, Waiting, Non-utilized talent, Transport, Inventory, Motion, Extra processing.

Which waste is the worst?

Overproduction is often called the worst, because it causes most of the others: making too much, too early, creates inventory, transport, storage, handling and hides defects. In practice, the most expensive waste in a given area is the one to tackle first, which is why this tool costs each one.

How do you measure waste?

Observe and count: how often does it happen per day, how many minutes does it take, how many people are involved? Multiply by working days to get hours a year, and value them at the labour rate. Add direct costs such as scrap, rework material or inventory holding cost.

What is a waste walk?

A waste walk is a short, focused visit to the process to spot and record the 8 wastes, ideally with the people who do the work. Use the eight categories as a checklist, record each example with where it happens and how often, and estimate its cost.

What is the difference between value-added and non-value-added work?

Value-added work changes the product or service in a way the customer is willing to pay for. Non-value-added work is waste and should be removed. Some non-value-added work is required (by regulation, or with today's technology) and should be minimized.

Free tool

5S Audit

Score Sort, Set in order, Shine, Standardize and Sustain, see the 5S radar and track the findings.

Open tool →
Free tool

Kaizen Report

Document quick improvements on before/after kaizen cards and total the annual savings.

Open tool →
Free tool

Kaizen Event

Plan a kaizen blitz: charter, team, daily agenda, before/after metrics and the 30-day action list.

Open tool →
Free tool

Standard Work

Build a standard work combination sheet with manual, machine and walk time against takt.

Open tool →
Free tool

Takt Time Calculator

Calculate takt time from available time and demand, then compare every step and size the crew.

Open tool →
Free tool

Cycle Time Analysis

Run a time study: element statistics, sample size check, rating and allowances to standard time.

Open tool →
Free tool

Line Balancing

Balance tasks across stations with precedence, see the Yamazumi chart and balance efficiency.

Open tool →
Free tool

Kanban Calculator

Size kanban loops from demand, lead time and safety stock, then print the kanban cards.

Open tool →
Free tool

Poka-Yoke

Mistake-proof a process: rate each error, design a device and move it up the control hierarchy.

Open tool →
Free tool

SMED

Cut changeover time: split internal and external work, convert and streamline, compare before/after.

Open tool →
Free tool

Heijunka

Level the production mix: build a heijunka box, a mixed-model sequence and check interval load.

Open tool →
Free tool

Visual Management Board

Run a daily SQDCP tier board with letter calendars, KPI status and an action list.

Open tool →
Free tool

Gemba Walk

Walk the floor with a structured checklist, log observations and follow up on the actions.

Open tool →
Free tool

OEE Calculator

Calculate availability, performance, quality and OEE with a six big losses waterfall.

Open tool →
Free tool

Value Stream Mapping

Map material and information flow, calculate takt time, lead time and process cycle efficiency.

Open tool →
Free tool

Spaghetti Diagram

Trace people and material movement on a floor plan and measure the distance travelled.

Open tool →

Make lean improvements stick

Cloudtheapp keeps the new standard in place: digital work instructions and checklists at the station, controlled documents with training records, audits, and every improvement action tracked to closure in one validated cloud platform.