Free Kanban Calculator and Card Generator

Size every kanban loop from demand, lead time and container quantity, then print the numbered production or withdrawal cards, ready for the board.

  • 100% free
  • No sign-up
  • Export to PDF, PNG & Excel
  • Data stays in your browser

Kanban loops

4 parts · 30 cards in total
Part numberDescriptionTypeDemand /dayLead (days)Safety %Qty / boxKanbansMax stockFromTo
63,000
816,000
13520
33,000
Lead-time demand2400 units
Kanbans (exact)5.76
Kanbans6
Max inventory3,000 units
Days of cover2.5 d

4471-B: 1200/day × 2 d × 1.20 ÷ 500 = 5.76 → 6 withdrawal kanban cards. Click a card to edit it; select another part in the table to print its cards.

WITHDRAWAL KANBAN1 of 64471-BO-ring 32 × 3 FKMQTY500FROMSupplier: SealTecTOSupermarket A-03Lead time 2 d · 1200/dayWITHDRAWAL KANBAN2 of 64471-BO-ring 32 × 3 FKMQTY500FROMSupplier: SealTecTOSupermarket A-03Lead time 2 d · 1200/dayWITHDRAWAL KANBAN3 of 64471-BO-ring 32 × 3 FKMQTY500FROMSupplier: SealTecTOSupermarket A-03Lead time 2 d · 1200/dayWITHDRAWAL KANBAN4 of 64471-BO-ring 32 × 3 FKMQTY500FROMSupplier: SealTecTOSupermarket A-03Lead time 2 d · 1200/dayWITHDRAWAL KANBAN5 of 64471-BO-ring 32 × 3 FKMQTY500FROMSupplier: SealTecTOSupermarket A-03Lead time 2 d · 1200/dayWITHDRAWAL KANBAN6 of 64471-BO-ring 32 × 3 FKMQTY500FROMSupplier: SealTecTOSupermarket A-03Lead time 2 d · 1200/day
Printable kanban cards for 4471-B. Select a card to edit the part.

What is kanban?

Kanban (Japanese for "signboard" or "card") is a pull system: a process makes or moves parts only when a downstream process has used them and sent a card back. Each card represents one full container, so the number of cards fixes the maximum inventory in the loop. Developed by Taiichi Ohno at Toyota, kanban replaces forecast-driven scheduling at the point of use with a simple visual signal, preventing overproduction, one of the eight wastes.

The kanban formula

Number of kanbans = (D × L × (1 + S)) ÷ C, rounded up, where:

  • D = average demand per day
  • L = replenishment lead time in days (from empty container to full container back at the point of use)
  • S = safety factor (e.g. 0.2 for 20%) to cover variation
  • C = quantity per container (one card per container)

Maximum inventory = number of kanbans × C. Days of cover = maximum inventory ÷ D.

Kanban calculation example

An assembly cell uses 1,200 O-rings a day, delivered by the supplier two days after a card is released, in bags of 500. With a 20% safety factor: 1,200 × 2 × 1.2 ÷ 500 = 5.76, so the loop needs 6 kanbans and holds at most 3,000 O-rings, 2.5 days of cover. Machined housings come from an internal cell with a one-day lead time in boxes of 40: 400 × 1 × 1.25 ÷ 40 = 12.5, so 13 production kanbans. The tool prints each card numbered 1 of 13, 2 of 13 and so on, so a missing card is noticed.

The six rules of kanban

  1. The downstream process withdraws only what it needs, when it needs it.
  2. The upstream process produces only what was withdrawn, in the order it was withdrawn.
  3. No parts move or get made without a kanban.
  4. A kanban always travels with the parts.
  5. Defective parts are never sent downstream.
  6. Reducing the number of kanbans step by step drives improvement.

Kanban works best with level demand. Smooth the production mix with a heijunka box and cut batch sizes with SMED.

How to use this Kanban Calculator tool

  1. List the parts. Add each part in the loop with its part number, description and kanban type.
  2. Enter the loop data. Enter average daily demand, the full replenishment lead time in days, a safety factor and the container quantity.
  3. Read the result. The tool calculates the number of kanbans, the maximum inventory and the days of cover for every part.
  4. Add the locations. Enter where the parts come from and where they go, so they print on the cards.
  5. Print the cards. Select a part in the table to show its cards (one per container, numbered "1 of N"), then export to PDF or PNG and print.
  6. Review regularly. Recalculate when demand or lead time changes, and remove cards as the process becomes more reliable.

Frequently asked questions

How do you calculate the number of kanbans?

Number of kanbans = (average daily demand × replenishment lead time in days × (1 + safety factor)) ÷ container quantity, rounded up. For 1,200 parts a day, a 2-day lead time, a 20% safety factor and 500 parts per container: 1,200 × 2 × 1.2 ÷ 500 = 5.76, so 6 kanbans.

What is the difference between a production kanban and a withdrawal kanban?

A withdrawal (move or conveyance) kanban authorizes moving parts from a supplier or supermarket to the point of use. A production kanban authorizes a process to make a quantity of parts to replace what was taken. Many systems use both: withdrawal kanbans pull from the supermarket, production kanbans trigger refilling it.

What lead time should I use?

Use the full replenishment lead time: from the moment a container is emptied and its card released, through waiting, order processing, production or supplier lead time and transport, until the full container is back at the point of use. Underestimating it is the most common cause of stock-outs.

How big should the safety factor be?

The safety factor covers variation in demand and lead time. 10% to 30% is typical for stable demand and reliable supply. Start conservatively, then reduce the number of cards step by step as the loop proves stable: removing cards exposes problems to solve.

What information goes on a kanban card?

At minimum: part number and description, quantity per container, where it comes from (supplier or process) and where it goes (location), and the card number out of the total in the loop (e.g. 3 of 6). Many cards also show lead time, a barcode and the container type.

What is the maximum inventory in a kanban loop?

Maximum inventory is the number of kanbans × the container quantity: the stock in the loop if every container were full at once. Days of cover is that maximum divided by daily demand. Kanban caps inventory at this level, unlike forecast-based push systems.

Free tool

5S Audit

Score Sort, Set in order, Shine, Standardize and Sustain, see the 5S radar and track the findings.

Open tool →
Free tool

Kaizen Report

Document quick improvements on before/after kaizen cards and total the annual savings.

Open tool →
Free tool

Kaizen Event

Plan a kaizen blitz: charter, team, daily agenda, before/after metrics and the 30-day action list.

Open tool →
Free tool

Standard Work

Build a standard work combination sheet with manual, machine and walk time against takt.

Open tool →
Free tool

Takt Time Calculator

Calculate takt time from available time and demand, then compare every step and size the crew.

Open tool →
Free tool

Cycle Time Analysis

Run a time study: element statistics, sample size check, rating and allowances to standard time.

Open tool →
Free tool

Line Balancing

Balance tasks across stations with precedence, see the Yamazumi chart and balance efficiency.

Open tool →
Free tool

Poka-Yoke

Mistake-proof a process: rate each error, design a device and move it up the control hierarchy.

Open tool →
Free tool

SMED

Cut changeover time: split internal and external work, convert and streamline, compare before/after.

Open tool →
Free tool

Heijunka

Level the production mix: build a heijunka box, a mixed-model sequence and check interval load.

Open tool →
Free tool

Visual Management Board

Run a daily SQDCP tier board with letter calendars, KPI status and an action list.

Open tool →
Free tool

Gemba Walk

Walk the floor with a structured checklist, log observations and follow up on the actions.

Open tool →
Free tool

Waste Analysis

Find and cost the 8 wastes (TIMWOODS) and rank where the time and money go.

Open tool →
Free tool

OEE Calculator

Calculate availability, performance, quality and OEE with a six big losses waterfall.

Open tool →
Free tool

Value Stream Mapping

Map material and information flow, calculate takt time, lead time and process cycle efficiency.

Open tool →
Free tool

Spaghetti Diagram

Trace people and material movement on a floor plan and measure the distance travelled.

Open tool →

Make lean improvements stick

Cloudtheapp keeps the new standard in place: digital work instructions and checklists at the station, controlled documents with training records, audits, and every improvement action tracked to closure in one validated cloud platform.